VIN “811 & 812” April Order Group

My truck went to D1 today with a estimated ship date of 5/26....
That's awesome for you!

I'm just bummed because I ordered three days before you and my VIN is 811...
I have a Billet Silver Level II on order as well. Maybe they will shove out some silver trucks this week and get mine going? Probably not, but a guy can dream!
 
And 903 delivered in early April, and many of them well before that. So what?
What is there to gain from giving them sequential VINs?

It does make sense for street addresses, but doesn't matter for a social security number, electric bill account number, and most other things. Including a VIN.
Yes, but there was a pattern prior to Stellantis and I’m sure there is one now. Much of the vin is predetermined. And also if you look at the April group there is a pattern of increasing numbers based on the date, except for the one outlier I noticed above. It really doesn’t matter but while waiting it’s interesting to see how things work.
 
Doing my best to be patient but did have to check in tonight for shits and grins. Looks like I’m still in D.
5B344B29-AA9E-4D10-A3F2-B427DBBADA43.webp

I’d be good with them building a batch of silver ones but I know that’s not how it works. 😬
 
They can start building mine now. Just deposited the checks from Givemethevin for the 'Hawk and the basic 1500.
 
VIN: 811780
Order Date: 4/23
Texas
Status: D

Deploying in July, so hopefully it comes in before then...but I don't have high hopes.
I have 715 and 783 on order. I ordered the 783 unit on Sat 7/23 as we’ll likely around the same time as you. Also Texas. Not sure if I’m status D yet. Chat told me that I’m not scheduled for production yet.
 
I just spoke with Chat and my estimated build time is 7-12-21 but I am still in scheduling.
 
So does anybody have any idea just how many TRX's are getting built a day? The VIN Numbers on the daily report seem all over the road with no rime or reason to them.
 
So does anybody have any idea just how many TRX's are getting built a day? The VIN Numbers on the daily report seem all over the road with no rime or reason to them.
The top of each daily report tells you exactly how many were built that day. So for today for example, there were 44 trucks built today.


 
The top of each daily report tells you exactly how many were built that day. So for today for example, there were 44 trucks built today.


I kind of thought that was the answer. It's just hard to guess how long it will be until my truck is built with a 811something VIN.
 
I kind of thought that was the answer. It's just hard to guess how long it will be until my truck is built with a 811something VIN.
I'm 811577 and was told I would be built 7-12-21. So waiting is a real thing.
 
I'm 811577 and was told I would be built 7-12-21. So waiting is a real thing.
wow, July?! I ordered mine a week and a half after you, so I hope that doesn't mean I'm looking at end of July just for a build date.
 
I'm 811577 and was told I would be built 7-12-21. So waiting is a real thing.
I think they shut down production mid July for about 1 week and then start 2022 production, so if so, that would put you at the end of 2021 production. Someone correct me if I'm wrong about the dates please.
 
I'm 800 VIN and ordered 4/13 but we picked a truck that was close to what I wanted and tweaked it and put my name on it. It was already in D status. I was told 6-8 weeks til it comes in. After reading all of these posts, that timeframe is laughable. I'm still in D status btw...
 