'MericaHere is my redacted POC, and RAM Tracker Status Images for those who may want do admire them
What’s your VIN, Order date?Has anyone had a Granite scheduled yet? Trying to figure out why all of these trucks with later VINs are getting scheduled . I am granite level 1.
Annnnnnndd...... There it is!Has anyone had a Granite scheduled yet? Trying to figure out why all of these trucks with later VINs are getting scheduled . I am granite level 1.
Everyone that’s bold enough to order a TRX needs it right away!Annnnnnndd...... There it is!
It starts already
500265 VIN and 08/18 order date.What’s your VIN, Order date?
I hear ya, being an engineer at heart and in sales - the whole thing baffles me, trying to make sense of their process.Not concerned about the wait. Legitimately trying to see if I can figure out any rhyme to it. I have not seen anyone post a granite truck scheduled.
Last 6 of VIN?View attachment 55805
Let the nail biting and hair pulling begin!
500513Last 6 of VIN?
I desperately want to make love to a school boy.With the folks here, who understand the chaos that is their reporting systems for delivery - Can we set an expectation of nothing actually arriving before the end of December, or are you saying there is a chance!
View attachment 55806
There’s always a chance. But keep in mind that the build date (or “ship date”) isn’t necessarily the date your truck gets on a train or transport truck. It’s the date it ships out of the factory and on to the next step (body vendor, or a holding lot).With the folks here, who understand the chaos that is their reporting systems for delivery - Can we set an expectation of nothing actually arriving before the end of December, or are you saying there is a chance!
View attachment 55806
Lol. My dude…if you’re going to take the time to redact something, actually redact it. It took ten seconds on my phone to make your VIN visible.Here is my redacted POC, and RAM Tracker Status Images for those who may want do admire them