VIN “811 & 812” April Order Group

Jeff emailed me today. Build week is set for the week of Aug 2nd.
I thought you were supposed to be built this week? I never got an email from Jeff about my build week...only a screen shot from my dealership showing the week of 8/2. Any recent updates on if the factory is open next week? I've been buried at work so I haven't trolled all the threads today like I normally do.
 
-locking lids for floor bins, or mopar locks #82211653
Ah, thanks for the reminder, 'box.

Noticed that they have a floor bin at least on the passenger side when on a creeper tour after I got mine.
And came across a box with locks that I removed from a '14 2500 the other day. Hopefully they'll fit.
 
99000CDA-7D2B-4929-BEF1-C2D2E3785EFD.webp

THIS IS NOT A DRILL!
 
How many of you are still at entering the build very soon?
 
Plowing through the manual now, which arrived yesterday. Want to change a few things on the gauges, for example.

Had a nervous moment when it looked like the voltage was only about 13.1, and fluctuated quite a bit.
Well, looking at what's actually the A/F ratio, it makes sense. Now I want to figure out how to get the volt meter on the first screen.

If I end up doing something picture worthy, I will. Have one, come to think of it. From my favorite nearby break-in road. Waiting for the gears to cool off a bit after gaining a few thousand feet.
DSCN0049[1].webp
 
Thanks dude. I’ll be there in no time. Can’t wait to see some pics of yours. You get it next week right?
No, dealer says estimated date is 8/8. I just got the window sticker 2 days ago so no way in hell I’ll see it that quick! lol
 
I ordered level 2, Red paint on 4/17. I just heard mine went to D1. Not too sure how that’s different than D, but I think maybe a few weeks for me is what my dealership said. I’m in Denver.
 
It's different in that they now have the parts needed set aside for your vehicle.
But I wouldn't count on "a few weeks" until you see it. It still has to be built, maybe go to an upfitter, and then shipped.
Shipping alone is likely two weeks for you, and that doesn't include getting it from the rail yard to the dealer.
 
I ordered level 2, Red paint on 4/17. I just heard mine went to D1. Not too sure how that’s different than D, but I think maybe a few weeks for me is what my dealership said. I’m in Denver.
I was in D1 for exactly a month, but a 2 week plant closure was a part of that. People have spent anywhere from a few days to 6 weeks+ in that status, so it doesn't necessarily mean your build is imminent. You'd almost need a miracle to see it this month. And Stellantis is kind of the opposite of a miracle worker.
 
I was in D1 for exactly a month, but a 2 week plant closure was a part of that. People have spent anywhere from a few days to 6 weeks+ in that status, so it doesn't necessarily mean your build is imminent. You'd almost need a miracle to see it this month. And Stellantis is kind of the opposite of a miracle worker.
We have been there for 5-6 weeks.
 

TRX Forum Favs 👍

Back
Top