2027 SRT TRX - 2026-09-23 (100 BS / 66 WS)

I ordered the first week. The dealer had confirmation that mine was supposed to ship Sept 14, then Sept 21, then Oct 11 and now Oct 21. I have my 2022 TRX sold and need to use it as trade for sale tax purposes. These delays will likely cause the sale of my 2022 to fail. I don’t know what to do at this point!

You are in better shape than what RAM has done to my order:
6/26/26 Ordered about the first week, order status BA
7/1/26 VIN assigned, order status D
8/10/26 Scheduled for production, Est ship date 9/29/26, Status D1
9/9/26 No more ship date, moved back to Status D
9/14/26 No more ship date, still only Status D

My VIN ends in 552060. Ram is way past that in production. Yet mine sits with no date. And, I traded in my 2023 TRX on 6/26/26.
 
You are in better shape than what RAM has done to my order:
6/26/26 Ordered about the first week, order status BA
7/1/26 VIN assigned, order status D
8/10/26 Scheduled for production, Est ship date 9/29/26, Status D1
9/9/26 No more ship date, moved back to Status D
9/14/26 No more ship date, still only Status D

My VIN ends in 552060. Ram is way past that in production. Yet mine sits with no date. And, I traded in my 2023 TRX on 6/26/26.
Ouch
 
According to my dealer, their ram rep told them today that production has stopped until next month for catch up and to make some changes. 🤷🏻‍♂️
Well if true, that could be good news, in that, it's better to have changes made on the assembly line, then through the dealership!

Maybe they'll fix that incorrect RHO skid plate that's been reported, along with fuel pump.(y)🇺🇸
 
I'm ok mine being in that last batch, as long as I get it before 2026 ends I am good. Even better if they have figured out the little things that were found on a couple of these first ones, not bad for building them this fast.

Hey at least it doesn't take 18-24 months like this turbo S I'm paying $300K for, it's all about perspective
 

TRX Forum Favs 👍

Back
Top